Relocation of the entire production hall to a location 12 km away. The machines were pulled out of the hall, loaded onto means of transport, secured with belts and then transported to the new hall in Chwaszczyno.
After transport, Ruger Expo employees unsecured the machines, unloaded them and unpacked all their components. The machines were placed in the hall and prepared for positioning and assembly at the site. The employees also prepared anchors for the machines.