Dellner company relocation

Relocation of the entire production hall to a location 12 km away. The machines were pulled out of the hall, loaded onto means of transport, secured with belts and then transported to the new hall in Chwaszczyno. After transport, Ruger Expo employees unsecured the machines, unloaded them and unpacked all their components. The machines were…

Show implementation

Unloading of a 60-ton machine tool

Unloading of a 5-axis machine tool, which arrived in 14 steel containers. The weight of the entire machine was 60 tons. Our tasks included unloading the machine base, inserting the head into the machine, transporting it to the destination, anchoring the machine with a special anchoring mass and leveling it.

Show implementation

Rubber Sanok relocation

Moving two LWB presses weighing 24 tons each to the new hall, placing them in their final location and anchoring them. During the implementation, an Ormig TM 33 mobile crane was used.

Show implementation